I have to qualify an already qualified WPS (qualified in the 1G position) in the 2G position for some out of position welding we will be doing. The joint is a double vee butt joint and the process is SMAW. In accordance with AWS D1.1, D14.6, etc. do I have to keep the test coupon exactly "straight up" or perpendicular to the floor when welding? It would help if I could lean the coupon back maybe 15 degrees to help catch and hold the filler metal. I am not sure if I am allowed to do this. Any thoughts or help ? Thanks