Up Topic Welding Industry / Technical Discussions / PWHT holding time.
- - By qaqcmpm (*) Date 08-25-2008 06:45
One of our vessel needs PWHT (ASME Sec VIII div 1), vessl thk is 45mm but UCS-56 states for P No 1 material upto 2" thk 15 minutes minimum holding time. Is it acceptable?
Parent - - By jon20013 (*****) Date 08-25-2008 09:04
UCS-56 requires 1 hour per inch (25mm), 15 minutes minimum so if your vessel is 45mm thick, 15 minutes would NOT be acceptable since 45mm is obviously greater than 25mm your soak time would be closer to 2 hours.
Parent - By qaqcmpm (*) Date 08-25-2008 09:50
thanks for the reply. 15 minutes is only minimum but for 45mm thk it is around 2 hrs.
Parent - - By GOKHANYAMAN (*) Date 03-09-2009 13:34
I could not find the max soak time for PWHT.? for the vessel thck is 45 mm for P1 material. There is min. req. in ASME sec VIII, but not max? if it came to me with +30 minutes soaking time,is it accepteble?
Thanks for advice.
Aztec
Parent - - By jon20013 (*****) Date 03-09-2009 14:17
I don't believe maximum soak time is a code issue, more tuned to be an engineering issue and depending on alloy, service requirements.
Parent - By js55 (*****) Date 03-09-2009 15:20
And whether impacts are imposed.
Parent - By GOKHANYAMAN (*) Date 03-11-2009 14:41
Thanks for advice.. I could not find in the codes and procedures, too. I will adress to Mr. Engineering..

Rgrds,
Aztec