All
Table 4.10 (Plate), Groove qualification_ Production Box Tube Welding Qualified, T-Y-K Connections, (PJP), Do you find it odd that a welder qualified 1G can weld T-Y-K connection on Box Tube when your not allowed to stop in the radius? Or I may be over thinking, seems a minimum would be 2G or 3G and stop in the flat? Please advise of your thoughts.
Thanks Roger