Not logged inAmerican Welding Society Forum
Forum AWS Website Help Search Login
Up Topic Welding Industry / Inspection & Qualification / Joint details on pages 119-123 of 2015 D1.1
- - By bmaas1 (***) Date 08-01-2015 17:36
Would you concur that these joint detail are indeed pre-qualified and do not require further qualification testing?

Regards,

Brian
Parent - By 803056 (*****) Date 08-02-2015 12:30
Wow, I wish I had a copy of the new and improved D1.1!

As a sustaining member, I might see mine in 6 months!

Just because the contractor is using a prequalified joint detail, it does not mean the WPS is prequalified. All the conditions of prequalification must be met and addressed by the WPS. If there is just one condition that isn't met, for instance the contractor elects to use something other than steel backing, all bets are off and it is a trip to the merry, merry pages of Clause 4.

Best regards - Al
Parent - - By ctacker (****) Date 08-02-2015 20:31
I'm curious, where did you get your 2015 copy? I haven't seen it in the bookstore yet.
Parent - - By Milton Gravitt (***) Date 08-03-2015 10:33
The hard copy doesn't come out until Sept.

       M.G.
Parent - - By ctacker (****) Date 08-03-2015 13:04
And the pdf at the end of August. That's why I asked.
Parent - By Lawrence (*****) Date 08-03-2015 13:28
Right,

I'm working with a couple D1 task groups and only have "draft" stuff.

Brian must have friends in high or possibly low places  :)
Up Topic Welding Industry / Inspection & Qualification / Joint details on pages 119-123 of 2015 D1.1

Powered by mwForum 2.29.2 © 1999-2013 Markus Wichitill