By HJLBX
Date 06-25-2016 02:57
5.17.1 General Requirements - "Tack welds and construction aid welds shall be made with a qualified or pre-qualified WPS and by qualified personnel."
I take "qualified or pre-qualified WPS" to implicitly mean that pre-heat is required for tack welds if pre-heat is required for the base metal.
Correct ?
Tack weld pre-heat would be particularly applicable to heavy member multi-pass tack welds and especially with certain filler metals.
Correct ?
The only exception tack weld pre-heat being when SAW will incorporate single-pass tack welds.
Correct ?