- By Joey (***) Date 11-30-2016 10:48
API std says, each U-tube shall be formed from a single length and shall have no circumferential welds.
What if the code is B31.1 or B31.3? I know that this a designer's call if no code restriction.
Any idea on why some engineers will not allow to have the splice joint at U bend? let say the pipe size is 2"dia below, P1 material.

Appreciate your input.
- - By Abid ali Date 12-17-2016 23:50
Dear experts,
Can we weld CS NPS 4" XXS elbow with 6" SCH160 CS pipe as per reference from ASME B31.3 and / or ASME B16.25.
Parent - By Joey (***) Date 12-19-2016 04:35
Hello Ali

You put added weight to my querry.:roll:
- By MAK Date 03-21-2017 19:49
I'm trying to develop a procedure for welding 9 Cr. pipe (P-5B) with GMAW spray transfer using a ER80S-B8 wire in the 1G rolled position. We are using a 90/10 AR/CO2 gas mix, a preheat of 400 degree F and 650 max. interpass temp. Does anyone have any tips/experience with this material?