Up Topic Welding Industry / Technical Discussions / ASME B31.3 Qualification by Others
- By dong won oh (*) Date 11-13-2000 11:01
I am a major contractor for a refinery factory.
I made a contract with a company for piping job.
I have developed welding procedures for a preliminary job.
Do my sub-contractor have to carry out new pq test based on B31.3 328.2.2, "by others" even though the same third party inspector witnessed at same location, the owner witnessed, the same brand electrodes will be used, the same grade pipe materials will be used.
Please inform me the definition of "by Others" Procedure.