Not logged inAmerican Welding Society Forum
Forum AWS Website Help Search Login
Up Topic Welding Industry / Technical Discussions / Seal Weld Tubes Without Filler
- - By kedawhit (*) Date 11-28-2005 20:53
I'm looking for some direction on writing a PQR/WPS for P8 tubes seal welded to a P8 tubesheet WITHOUT filler metal. What sections of the ASME code (Section IX?) would apply? Does Article F3 apply? What limits, i.e. tube diameter, wall thickness, are to be considered?
Parent - - By jon20013 (*****) Date 11-28-2005 21:31
Your process variables will be addressed in QW-200 of ASME IX for procedure and QW-300 for performance. Your SPECIFIC variables (over and above and either deleting or modifying ASME IX requirements) will come up in either ASME Sections 1, III or VIII.
Parent - By kedawhit (*) Date 12-08-2005 14:45
Sorry it's taken me this long to respond. Thanks for the information.
Up Topic Welding Industry / Technical Discussions / Seal Weld Tubes Without Filler

Powered by mwForum 2.29.2 © 1999-2013 Markus Wichitill