Not logged inAmerican Welding Society Forum
Forum AWS Website Help Search Login
Up Topic Welding Industry / Technical Discussions / Requirements for Weathering steels??
- - By rtrautman (*) Date 03-03-2006 21:44
Are there any specific requirements regarding pre-heat, post heat, or delayed cracking inspection for weathering steels? The type and grade I had in mind was ASTM A709 Gr 50W.
Parent - By CHGuilford (****) Date 03-03-2006 22:12
I am not aware of any different preheat or delayed cracking concerns. I treat it the same as I would A709 grade 50.
My D1.5 PQR's are done with A709-50W so that they cover the lesser grades as well. That allows fillets up to 5/16" (single pass) without the need for a matching filler metal. If I need a matching filler metal on grooves then I can weld out all but the cap passes with non-weathing electrodes.
I recall there used to be a concern with low heat input WPS's , and also with arc strikes, but that seems to be history from what I have seen. Those issues are now handled as routine in the D1.5 code; I can't say for other welding codes.

Chet Guilford
Up Topic Welding Industry / Technical Discussions / Requirements for Weathering steels??

Powered by mwForum 2.29.2 © 1999-2013 Markus Wichitill