Not logged inAmerican Welding Society Forum
Forum AWS Website Help Search Login
Up Topic Welding Industry / Welding Fundamentals / pipe/transitioning
- By mometal77 (*) Date 07-16-2006 14:16
I once saw a guy use a bolt on a vertical pipe with differnt wall thicknesses.   He put the put the pipe in the clamp and welded a bolt in the gap.  Took the pipeclamp off and cut the top and bottom with an oki beveler.  On the bottom was hooked up too a strap and excavator.  Some shop tests here do this too see what you do know.  Over most companies that deal with pipe here also deal with the refineries.
robert
Up Topic Welding Industry / Welding Fundamentals / pipe/transitioning

Powered by mwForum 2.29.2 © 1999-2013 Markus Wichitill