I'm doing a structural job. We demo a 30,000 sf metal bldg(150x225x30), everything but the frames and are about done putiing on new purlins and sheets. It's been a b**tard, roof was so rotten you couldn't walk on it, had to cut purlins from below and drop roof in 30x25 sections. I'm tired of structural and wanting to get back in the oilfield.