The inspection and test plan should be derived from the project specs, design drawings, specific country laws/regulations and code, and performed in order of accessibility. I.E. You don't want to cover up a required examination until it is accepted. For the welding map, I assume your refering to what is required for inspection, that is part of the ITP. As for what structure, doesnt really matter. If engineering has a set of design drawings, they should have also designated weld size location etc. An ITP is more attention to detail and awareness of the previously mentioned requirements.
Regards,
Gerald