Dear Swnorris, Cong and all associates,
From the Para 4.12 (1) of AWS D1.1 we found that welder qualification by a butt joint with backing or with backgouging is indeed acceptable. Para 4.12 (1) specifies for Tubular connection which has no any changes in positions for the welder during his ferformance.
For Non-Tubular connections, Para 4.23 doesn't specifies clearly just because qualifiaction by a butt joint with backing or with backgouging on 1G, 2G ,3G are completely similar and would be accepted. However at 4G position, the secondside welding after backgouging will be in 1G postion and in this case qualify by joints with backgouging in 4G position does not qualify for production joints with backing in 4G position.
Hope that we have same Code clarification on this issue.
Rgds
Truong Thien