- - By alkhiat (*) Date 03-21-2010 10:51 Edited 03-21-2010 10:54
A pipe 6" sch. 40 ASTM  A 106 Gr. B was welded by two passes only and now after ( 30 days) we wnat to weld the last pass ( the cap) is it right ? or we have to cut out the pipe and reweld it
please tell me where could I find the answer from code weather it AWS or ASME B31.3 ?
thank you
Parent - By js55 (*****) Date 03-22-2010 13:19
There is no answer in the code. Just make sure the weld is clean and weld it. You may wish to do some volumetric NDE to verify the weld is still acceptable.
Parent - By G.S.Crisi (****) Date 03-22-2010 19:44
There's no time limitation to complete the weld, provided, as js55 said, it's clean and free from rust, oil, grease etc. 
Back in my days of erector engineer always happened that, during the last piping inspection before hydro test, we discovered one uncomplete weld. Surely, at lunch or quitting time the bell rang and the welder hurried up his way to the exit gate. Then, when returning back to the job, he forgot about the uncomplete weld and started another one.
Giovanni S. Crisi
Sao Paulo - Brazil