- - By k_blaxton Date 05-27-2010 19:18
Is the prequalified WPSs in D1.1 restricted to just one welding process? Lets use for example; a B-L2c-S joint configuration for sub-arc. The joint requires backgouging. Could you weld the gouged side with GMAW with spray transfer and not have to qualify the process?
Parent - - By pipewelder_1999 (****) Date 05-27-2010 21:02
Welcome to the forum Mr Blaxton.

Are you the Mr. Blaxton right down the road ?

There is nothing that prohibits such provided all essential variables are met. Unless something has changed. It was addressed in a D1.1 interp back in the 80's.

Gerald Austin
Parent - By pipewelder_1999 (****) Date 05-27-2010 21:04
Here is the interpretation. However a Multiprocess WPS cannot be divided into its individual WPS's. A mistake I have made in the past.
Parent - - By k_blaxton Date 05-27-2010 23:34
Yes I am. I have the interpretation book and completely overlooked it. I found it but it seemed a little vague. Thanks G.
Parent - - By pipewelder_1999 (****) Date 05-28-2010 01:27
Sorry I was on my way out when I posted and forgot to post the link. Here is the one I was referring to.

http://files.aws.org/technical/interps/d1-85-019.pdf

Test at the papermill tomorrow so my brain is scattered. Have to take one of those personality profile tests that I never seem to be what they are looking for.
Parent - - By joe pirie (***) Date 05-28-2010 01:31
remember when they ask if your on a mission from god to answer yes
.guaranteed a private little meeting with the shrink i love screwin with those
tests
Parent - By 803056 (*****) Date 05-28-2010 03:58
Now we know the real reason you left the DOE project.

Best regards - Al