Review the requirements of Clause 4, Part D for CVN requirements. The Engineer has to provide direction regarding what to test, weld, HAZ, base metal, minimum absorbed energy, and test temperature.
The range of base metal qualified, i.e., specifications, are severely limited.
A prequalified WPS includes a wide range of base metal specifications, that isn't the case when CVN is required.
Best regards - Al