Depends on the engineer to give final yea or nay. They are already involved so just ask.
But, that is not a problem if the weld were brought in only along one side and the backing bar was not 'connected' to the second side until after the opening was brought to tolerances and allowed to cool before starting the 'tie in' pass.
If tied together prior to that then the engineer should give the final acceptance.
Brent