Bill,
The anchor rods are 1 1/4" diameter. The field is telling me that there is 4" of projection above the pier, but I need at LEAST 5" for full thread engagement in the nuts. I know that the rod are Q&T, so preheat and post heat are required but do you have any ideas what would be required to get the rods back up to spec. should we say?