I can't understand the responses that have been posted, but the C.E. of ASTM A615 rebar is not controlled and must be determined via chemical analysis. This analysis is usually reported in the MTR. The C.E. of ASTM A615 rebar generally falls between 0.6 and 0.7, so preheat is almost always required for welding.