In the visual inspection section of B31.1 it states that every completed weld shall be visually inspected. I say this means that the completed weld shall be inspected not each weld pass. If each pass is needed to be inspected, by someone other than the welder, the Engineer will state that in his documents. Am I wrong and that statement means a weld inspector shall look at every weld pass from start to finish? Please I need an answer on this as a lot is at stake.