Thank you for the reply. Reinforcement is not an issue, the welds are underfilled from .5 to 2.5 mm. Contractor is under the impression that 5.24.4.1 allows the welds to be underfilled up to 1/32". Again the is no document (drawings, PQR's, WPS,s , etc.) that requires the welds to be flush.