- - By tjinsp (*) Date 09-28-2007 23:54
[deleted]
Parent - By CWI555 (*****) Date 09-29-2007 00:35
3.2.3 company:
The owner company or the engineering
agency in charge of construction. The company may act
through an inspector or another authorized representative.

9.2 RIGHTS OF REJECTION
All nondestructive test methods are limited in the information
that can be derived from the indications they produce.
The company may therefore reject any weld that appears to
meet these acceptance standards if, in its opinion, the depth of
an imperfection may be detrimental to the weld.

By 9.3 that condition is acceptable. However; I believe 9.2 in the 20th edition was put in for reasons such as you've mentioned. Be careful with this one as it's a subjective call. Be sure the company is on board with your interpretation, otherwise it's better to leave it be.

Regards,
Gerald
Parent - - By g32141 (**) Date 09-29-2007 03:24
If there is more than 1" of IP within 12" then it is rejectable. It doesn't matter if two different welders put it in. Are you the one doing the film interpretation?

The welder is right as long as the film has no 1" IP defect. If it passes radiography how can you now fail it for something that you should have rejected visually before it was even radiographed?

If it passes radiography case closed.

If you're the client you can reject anything you want simple as that. But make sure you have a valid reason. 3/4" of IP on a radiograph when they are allowed 1" isn't one in my opinion. Keep that up and it is a good way to get run off even if you are the client. I have seen seen clients run off before.
Parent - - By CWI555 (*****) Date 09-29-2007 04:19
You are correct in that this can get you run off. But I draw you attention to paragraph 9.2 as quoted in my original post. If the resulting notch is deep enough, it could fall under the guide of that paragraph. As said, that's a subjective call, and not to the letter of the code, any calls of this nature need to be in compliance with the directives/specifications of the company. If that companies directives are more stringent than the code, and all parties signed onto this contractually, then it is in fact a legit call as you can always go more stringent, but not the other way.

On the other side of the coin, if this notch is shallow and the decision is being made solely by the radiographer or site inspector without the clearance of the company, then that person or entity can be subject to many back charges for unnecessary work and delay, which is why the caution in the original post.

In short, to say "case closed" is in error without knowing what the directives/specifications of the company are.

Regards,
Gerald
Parent - - By g32141 (**) Date 09-29-2007 05:23
You're right the case is not closed.

In the 20th edition section 9.2 talks about the rights of rejection. You are not going to be able to tell the depth of the defect using radiography, sorry. You might get a general idea of its depth. IP is in the root as everyone knows and depending on the customer's requirements it could be cause for rejection.

The original poster never mentioned that. He just said 1" in 12" with IP. Pipeline jobs aren't going to do anything more stringent than the code in my experience unless they use an ECA. With an ECA you can have more than 1" in 12" as long as you can measure the height of the defect.

He also said that there was no decernable root on the radiograph without ever giving the actual length of it. If a CWI acting as a client rep is rejecting lots of welds that pass radiography and he is reading the film and rejecting the original call he had better have a good explanation and hope that his company's requirements are more stringent than the code in regards to depth portion of 9.2.

The depth of IP is a given as it is through wall all the way to the root. What happens if this same thing happens with slag higher up in the passes using radiography where you can only guesstimate about the depth? Something to think about.

CWI's that want to look at film should have at least a year or two as a radiographer under their belt before they can take this AWS film interp class. Actually shooting welds, developing film and reading it and making calls.
Parent - - By tjinsp (*) Date 09-29-2007 05:52
There is a level 3 interperting the film on board the lay barge and he brought it to my attention, I contacted the engineering firm that I work for and (is the design firm for the pipeline) about this and he said it was my call. As for me interperting film, I don't.  The company pays a level 3 to do that.  I just was looking for some feed back.

Where in API 1104 more than 1" IP is allowed in any weld ( with the exception of IPD)
Parent - - By g32141 (**) Date 09-29-2007 23:57 Edited 09-30-2007 02:12
Your'e allowed 1" in 12" for IP (25mm in 300m) for IP. For slag you are allowed more. Remember that if you have 1" of IP that is acceptable and you have another 1" that is acceptable somewhere else in the weld you need to make sure that the two of them combined don't exceed 8% of the weld length for weld lengths less than 12".

This less than 12" rule doesn't appy to slag for example. For slag you are allowed 2" in 12". 50 mm in 300mm. But if you have 3 2" acceptable indications you need to add the 3 to make sure that they don't exceed 8% of the total weld length.

This is from the 20th edition.
Parent - - By tjinsp (*) Date 09-30-2007 01:26
I Don't have a copy of API 1104 20th edition handy, but did the slag indications change from 2" in 12" (50mm in 300mm) to 2" in 300" or was that a misprint.

This pipeline is using 1104 19th edition as spec. out from engineering. All I have to refer to is 19th edition.
Parent - By g32141 (**) Date 09-30-2007 02:14
It was a mistake on my part. I made an edit to my post.
Parent - - By CWI555 (*****) Date 09-29-2007 09:39
"oh Lord, I've been up 36 hours and have been imbiding, please forgive the rant that will now ensue"

"You are not going to be able to tell the depth of the defect using radiography, sorry"
I've been nuking silver halides off an on over 22 years as a level II and III, loading it, shooting it, running it, interpreting it, writing procedures, and take a little offense to that "sorry" at the end of that sentence.

I am fully aware that you cannot determine depth with accuracy via standard RT methods, and I don't recall ever stating that you could.

As for Engineering Critical Assessment (ECA) AKA(also known as) Fracture Mechanics Analysis (FMA) you are correct, if done properly it will reduce the number of rejects as it's typically a fitness for service method which is according to Appendix A1 typically requires additional PQR's (procedure qualification records) (for CTOD crack tip opening displacement; fracture toughness test among other things), stress analyses, and testing. That NDE testing typically (these days) utilizes Automated Ultrasound (AUT) which can be comprised of many elements such as Time of Flight Diffraction (TOFD) Refracted Longitudinal waves (RL's) Head waves via RTT (round trip tandem), creep waves, secondary creep, and a whole host of other acronyms for UT methods, all balanced within the FDUM's (flaw detection uncertainty models). With modern systems, if you can't plot the flaw out with a high degree of accuracy with the mentioned elements, you need to go back to making donuts. (only used for girth welds between sections of equal thickness at that per A1.)

Which leads me to a pet peeve of mine. People who use acronyms without explanation as to what they are. Every industry has reams of them and the military has a 2 for 1 perpetual sale on them. As an example : The CRDM's experienced a fault in the VAM initiating the SCRAM, which caused the RCP2 to spin up, with a subsequent initiation of ECCS systems, and notification to the NRC that a ENR is forthcoming.

Translated: the control rod drive mechanisms experienced a fault in the vibration alarm motor initiating the 'safety control rod axe man' (official NRC definition as was coined at the first Chicago pile) which caused the reactor cooling pump 2 to spin up with subsequent initiation of the emergency core cooling systems, and notification of the nuclear regulatory commission that a event notification report is forthcoming.

A reader reading the the first sentence who has not worked in the nuclear industry or been in the military with the same, probably wouldn't have a clue what I just said, but the second sentence will give them an idea as to what the hell I was talking about, and thus allow them to glen some useful information from it even if they are uninitiated. Since the idea of the forum is the dissemination of useful information to those with a question and a need, I think the use of these acronyms such as ECA or IIDD (inertial impact delivery device "hammer") and others should be explained so as the people who don't know what the hell it means can learn rather than be kept in the dark.

Bottom line, the man came in looking for help and answers which was a smart move on his part as has been noted he could be getting himself in trouble.
The idea is to help, not to make them feel stupid. Lord knows I've been guilty of it but I do try to reign myself in from time to time. Something to consider.

Regards,
Gerald
Parent - By tjinsp (*) Date 09-29-2007 12:48
Gerald

Am I reading API 1104 Section 9.2 wrong?  The depth of the imperfection means how deep it is or the extent of the imperfection within boundries of the code? I think that the commitee that wrote this section knew good and well that you could not see how DEEP the imperfection with RT methods. the tech can only determine where in the welded V groove the imperfection is and judging by that, determine how deep the imperfection is inside the welded groove.
Parent - By g32141 (**) Date 09-29-2007 23:35
I wasn't trying to make anyone feel stupid and I didn't mean to offend you.

I was trying to help out. The last thing someone needs is to be doing is holding up production on a pipelay barge, getting welders that passed radiography run off or even worse making the barge back up for no reason. I have seen it and would not like to be on the wrong end of that stick. You are timed by supervisors with stop watches to determine how much down time is involved and they will try to blame anyone in order to back charge for the lost production time. One hour of down time on a barge that costs a quarter of a million dollars a day to operate is a lot of money.

The offshore pipeline welders are some of the best or they wouldn't be out there. They know what they need to do in order to pass radiography even if they try to hide something by adding extra reinforcement (which in my opinion is a shady thing to do).

"Which leads me to a pet peeve of mine. People who use acronyms without explanation as to what they are."

The original poster is using API 1104 and is a CWI. I should not have to explain what the acronym ECA, or IP stand for. Are you upset because I did not put the words Certified Welding Inspector in parenthesis after I typed CWI? You seem to be cherry picking in your post. It'll be my spelling or grammar next won't it?

Complain to the moderators and ask them to put up a sticky post with a list of all of the acronyms used in every welding code.

Sorry for the rant.

I forgive you for yours by the way.
Parent - - By Shane Feder (****) Date 10-05-2007 11:59
Gerald,
I think you must have imbibed a bit too freely tonight.
I was just reading a post on radiographing socket weld gaps and one of our esteemed members mentions MIC which he then kindly explains in a later post is Microbe Induced Corrosion.Just as well because I didn't have a clue what MIC was/is.
Regards,
Shane
Parent - - By ZCat (***) Date 10-05-2007 14:14
Why is the second welder starting his bead so far from where the first started? That's just shoddy welding practices in my opinion. Are they getting paid a production premium? Does it take too long to knock down a start with a grinder, or aren't they allowed to grind? Whatever the code, I would never just leave a void in a root on purpose, maybe I'm too anal.

On another note, I've been studying the 1104 for my CWI exam in a couple of weeks, I'm wondering if I should have picked a different code. That Appendix A Imperfection Interaction stuff is way over my head. Wouldn't that be a radiographer's call?
Parent - By tjinsp (*) Date 10-05-2007 19:01
ZCat

"Its the new OIL FIELD"  (LEAD in A--) I welded pipeline on lay barges before and it never would have occured to me to not grind the start of the other bead. A pipeline welder in mid 70s would have been run off for doing that. (No matter what the code said.) With that said, I tested on API 1104 because that was the direction I was heading and passed all 3 test in the high 80s. I was a little more familier with AWS D1.1. It depends the direction your heading, I use both codes on a regular basis and also B31.3 on hook ups. I don't know about the test for D1.1 but people I have talked to say that its easier. Don't let me change your mind on which code to test on, everybody is different, if you decided to test to 1104 then study that code.
Parent - By dbigkahunna (****) Date 10-08-2007 04:19
Simply because you cannot "see" the bead is not grounds for rejection. If the density of the bead is less than or equal to the pipe, the weld is acceptable. If ip is 1 inch, the weld is acceptable, Yea, it may be "right at the line", but so what. If the level III comes to me to ask for my "opinion" he is a ROMF. Same for a Level II. If the film grader does not have a densitomiter to determine the density of the film at the area of interest, the Xray company is a ROMF.
Unless I have the certification to be a Level II or III, then I do not interpert film. If the IQI's are in the right spot and are correct for the pipe thickness, there are no artifacts on the film or in the area of interest and the film identifiers are in the right spot, that is ALL I can accept or reject. No matter how much experience I have.
No one is paying you to interpert film. That is the Tech who is qualified by ASNT TC1-A. I cut my teeth qualifying film. I can read film as well as any Level II. But I dont. Aint my job. If I hire out to be a pipeline visual inspector, that is all I am. If I am over the  welding inspectors and find out one of them is reading/interpreting film, he/she gets a talking to. The second time they are gone. OUr job is to be sure the FILM meets quality. As I review the film and see a Level II is missing something then I go the the LEvel III and get it straightened out.
Welders only have to weld just enough to pass code. If you want them to meet your specifications, let them know. But dont be doing no BS "I cant see the root on the film" so repair the weld. Try that on a slave barge, and you will be on the next helicoptor out!
And the reason they are doing that is to lower the chance for a burn through. And they must be using internal line up clamps because if you are using externals, somebody is gonna get banged with the clamp and a fight will be on. If hot pass is catching the IP the bead hand is leaving, the pipeline company better be giving the hot pass hand an extra hour cause he is saving the bead hands butt. Sounds like a pretty squared away front end. Not their first rodeo.
Parent - - By g32141 (**) Date 10-09-2007 04:18 Edited 10-09-2007 04:21
What happened?

Why did you delete your original post?

You didn't make a barge back up and cut out perfectly good welds did you?
Parent - - By newjack Date 10-15-2007 16:27 Edited 10-15-2007 16:30
[deleted]
Parent - By swsweld (****) Date 10-16-2007 03:22
That's just wrong :)