Need some advice for record keeping on approximately 75 moment connections. I want to track, column locations, elevations/floor levels, fit ups (top and bottom flanges) with dates and welders on each. In addition I want spaces for VT date (pass/fail) for each flange and same for UT date (pass/fail) on each flange.
I want to keep the form with all of the above information with the field drawings for reference.
Thanks in advance for your time and effort.