If you operate using the same settings, the deposition rate is the same. The thing that may change is the production factor due to increased fatigue of the operator.
Deposition efficiency may also change as the overhead position with some processes due to spatter loss and stub loss.
For an overall calculation of costs, factors besides the deposition rate of the process need to be known.