Topic User Posts Last Post
- SAW cons substitution Firefly 2 08-15-2012 21:16
- ASME and AWS B2.1 js3106 27 08-06-2012 21:17
- RMD using GMAW and FCAW for CS,CuNi and DSS material welding Nalla 5 07-31-2012 12:45
- ASME Sect IX- Welding Operator Qualification Requirements Nalla 3 07-28-2012 06:27
- PED PERFORMANCE QUAL Mikeqc1 3 07-25-2012 23:06
- GTAW Non-Ferrous PQR, is an A-Number required in the PQR? Kix 6 07-17-2012 11:48
- PED performace Qualifications Mikeqc1 8 06-20-2012 11:51
- PED Material supplier Mikeqc1 6 06-20-2012 01:10
- A number for PQR jsdwelder 19 06-08-2012 20:04
- What is the definition of Major Flow in brazing? Kix 2 06-06-2012 16:51
- Tack weld and qualification sciroccos1111 2 06-01-2012 11:01
- metal substitution for welder qualification dlmann 14 04-22-2012 15:27
- Autogenous Qualification pataterchip 3 04-16-2012 06:06
- Low temperature per B31.3 fschweighardt 13 04-11-2012 01:44
- PWHT for clad pipe under B31.3 hung7601 14 04-03-2012 13:44
- Welders qualification ASME vs AWS Larry Theroux 12 03-26-2012 20:29
- Laminations SA-240 Mikeqc1 5 03-25-2012 20:34
- Performance qualification reta 4 03-24-2012 14:49
- U-STAMP compliance question Kix 15 03-24-2012 02:29
- 1/2t-t+ 1/4" pataterchip 13 03-22-2012 21:58
- WPS for Sect.9 and PED vdao3004 18 03-11-2012 11:57
- Material of the ASME Sec.III john8790 2 03-07-2012 18:19
- Is overlap considered a defect in ASME Sec VIII Div 1? Kix 41 03-06-2012 14:06
- ASME Sec IX Welder qual filler metal deposited question Kix 3 02-27-2012 21:17
- GMAW/FCAW Separate Process ASME? zinnan 12 02-27-2012 18:38